Integration Planning
Review the component, robot layout, tooling, welding source and peripheral equipment together.
Connect robot motion, welding equipment and the shop-floor workflow in a practical automation plan. Discuss KUKA integration, programming and production support requirements with Kavin Inc.

Manufacturer illustration: KUKA arc welding robots.
Review the component, robot layout, tooling, welding source and peripheral equipment together.
Scope robot paths, tool and work frames, peripheral signals, dry runs and production trials for the selected controller.
Discuss troubleshooting, maintenance planning and operator training around your installed robot and application.
Start with drawings, process information, robot and controller details, and existing cell documentation. The integration scope is defined around your equipment, safety requirements and acceptance criteria before work begins.
Share the application, current challenges, controller details and production targets.
Agree the cell scope, interfaces, trials and commissioning plan. Review safeguarding and operation before production use.
Document the agreed program, operating procedure, training needs and follow-up support.
Share part photos, process details, production targets and your robot or controller information.